| 000 | 00890cab a2200193 4500 | ||
|---|---|---|---|
| 001 | ABS37071 | ||
| 008 | 090401t1986 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u2090 | ||
| 041 | _aeng | ||
| 245 | _aFitting-out commercial buildings | ||
| 260 | _c1986 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding _v251(7472) 21 November 1986, 69-80(12) |
||
| 520 | _aComprehensive study of the internal refurbishment of office buildings , concentrating on adapting buildings from the 1960s and 1970s. Describes a project undertaken for Wang Laboratories . Reviews the contribution of flexible layout for building services and computer aided design to achieving efficient refurbishment and at the benefits of employing a design and build contractor. Briefly covers the advantages of fast track construction . | ||
| 650 | _aDESIGN | ||
| 690 |
_aRefurbishment _96264 |
||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c1253 _d1253 |
||