000 00890cab a2200193 4500
001 ABS37071
008 090401t1986 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u2090
041 _aeng
245 _aFitting-out commercial buildings
260 _c1986
350 _a0
490 _aBuilding
_v251(7472) 21 November 1986, 69-80(12)
520 _aComprehensive study of the internal refurbishment of office buildings , concentrating on adapting buildings from the 1960s and 1970s. Describes a project undertaken for Wang Laboratories . Reviews the contribution of flexible layout for building services and computer aided design to achieving efficient refurbishment and at the benefits of employing a design and build contractor. Briefly covers the advantages of fast track construction .
650 _aDESIGN
690 _aRefurbishment
_96264
942 _n0
948 _c04/03/1997
999 _c1253
_d1253