| 245 | _aDesign impact of construction fast-track | ||
| 260 | _c1988 | ||
| 350 | _a0 | ||
| 490 |
_aConstruction Management & Economics _v6(3) Autumn 1988, 195-208(14) |
||
| 520 | _aThis paper briefly outlines the differences between the fast-tracking and phased construction management techniques. It illustrates, through a project study, the impact of compressing and overlapping design activities in a fast-track programme in order to expedite project delivery. An in-depth delay analysis is presented to show the impact of fast-track related problems on the construction duration. Finally, based on the project study presented in this paper and in reference to other fast-track projects which have experienced difficulties, recommendations are made for the effective utilization of this accelerated technique. References. (Taken from Journal Abstract) | ||
| 650 | _aBUILDING PROJECTS | ||
| 650 |
_aProject management _96261 |
||
| 690 | _aBUILT ENVIRONMENT | ||
| 700 | _aMoselhi, O. | ||
| 700 | _aTheberge, P. | ||
| 700 | _aRevay, S. | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c13509 _d13509 |
||