000 01312cab a2200253 4500
001 ABS39933
008 090401t1988 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u20158
041 _aeng
100 _aFazio, P.
245 _aDesign impact of construction fast-track
260 _c1988
350 _a0
490 _aConstruction Management & Economics
_v6(3) Autumn 1988, 195-208(14)
520 _aThis paper briefly outlines the differences between the fast-tracking and phased construction management techniques. It illustrates, through a project study, the impact of compressing and overlapping design activities in a fast-track programme in order to expedite project delivery. An in-depth delay analysis is presented to show the impact of fast-track related problems on the construction duration. Finally, based on the project study presented in this paper and in reference to other fast-track projects which have experienced difficulties, recommendations are made for the effective utilization of this accelerated technique. References. (Taken from Journal Abstract)
650 _aBUILDING PROJECTS
650 _aProject management
_96261
690 _aBUILT ENVIRONMENT
700 _aMoselhi, O.
700 _aTheberge, P.
700 _aRevay, S.
942 _n0
948 _c04/03/1997
999 _c13509
_d13509