000 00780cab a2200229 4500
001 ABS39982
008 090401t1988 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u20434
041 _aeng
100 _aViney, I.
245 _aBiological way to clean sites
260 _c1988
350 _a0
490 _aSurveyor (PWW)
_v 170(5018) 27 October 1988, 18-20(3)
520 _aDescribes how 10 hectares of heavily polluted industrial land were successfully reclaimed by microbial treatment. Reclamation of the Blackburn gasworks site is the largest project in Europe to date to rely principally on this technique.
650 _aBIOLOGICAL TREATMENT
650 _aCONTAMINATED LAND
650 _aDERELICT LAND
690 _aLAND
942 _n0
948 _c04/03/1997
999 _c13692
_d13692