| 000 | 00717cab a2200229 4500 | ||
|---|---|---|---|
| 001 | WB2741-03 | ||
| 008 | 090401t1991 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u20530 | ||
| 041 | _aeng | ||
| 245 | _aTunnel costs | ||
| 260 | _c1991 | ||
| 350 | _a0 | ||
| 490 |
_aFinancial Times _v24 October 1991, 23 |
||
| 490 |
_aContract Journal _v360 (5844) 24 October 1991, 1(4) |
||
| 520 | _aHighlights the cash flow crisis between Eurotunnel and the contractors working on the Channel Tunnel. TML promotes the contractors point of view. (See also WB 2740-04). | ||
| 650 | _aCASH FLOW CRISIS | ||
| 650 | _aCHANNEL TUNNEL | ||
| 650 | _aTML | ||
| 690 | _aBUILT ENVIRONMENT | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c13754 _d13754 |
||