000 00699cab a2200229 4500
001 WB3206-08
008 090401t1996 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u20973
041 _aeng
245 _aBasis for a building
260 _c1996
350 _a0
490 _aFinancial Times
_v7 February 1996, 15(1)
520 _aThe BRE is using crushed concrete from a demolished office block in the construction of the Energy Efficient Office of the Future.
650 _aENERGY CONSERVATION
650 _aLOW ENERGY OFFICES
650 _aOFFICE BUILDINGS
650 _aRECYCLED AGGREGATES
690 _aBUILT ENVIRONMENT-CONSTRUCTION DESIGN
942 _n0
948 _c04/03/1997
999 _c14069
_d14069