000 00770cab a2200205 4500
001 ABS40060
008 090401t1988 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u21118
041 _aeng
100 _aAllen, J.D.
245 _aTime the measure of performance on commercial sites
260 _c1988
350 _a0
490 _aConstruction News
_v(6089) 24 November 1988, 6(1)
520 _aA brief summary of the report by NEDO , Faster building for commerce, which claims that despite the development of management contracting and construction management, the building of most office s and shopping centres is still carried out on traditional lines.
650 _aBUILDING INDUSTRY
690 _aBUILT ENVIRONMENT
942 _n0
948 _c04/03/1997
999 _c14170
_d14170