| 000 | 00636cab a2200229 4500 | ||
|---|---|---|---|
| 001 | WB3142-58 | ||
| 008 | 090401t1995 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u22344 | ||
| 041 | _aeng | ||
| 245 | 4 | _aThe case for a coherent plan | |
| 260 | _c1995 | ||
| 350 | _a0 | ||
| 490 |
_aIrish Times _vProperty, 9 November 1995, 6(1) |
||
| 520 | _aLooks at urban growth in Dublin, and how future regeneration should be within a proper planning framework. | ||
| 650 | _aDUBLIN | ||
| 650 | _aIRELAND | ||
| 650 | _aREDEVELOPMENT | ||
| 650 | _aURBAN REGENERATION | ||
| 690 | _aURBAN RENEWAL | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c14969 _d14969 |
||