000 00841cab a2200181 4500
001 ABS40231
008 090401t1989 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u22370
041 _aeng
245 _aHammersmith development
260 _c1989
350 _a0
490 _aArchitects` Journal
_v189(1/2) 4/11 January 1989, 33-55(16)
520 _aA "Building" study which looks at the riverside development by Richard Rogers and Partners at Hammersmith , Thames Reach . The transformation of a former oil works includes housing and office space with new accommodation for the architects themselves; (33-46). Economic and cost analysis; (47-49). Working details on balconies used in the private housing scheme; (53-55). Photographs, diagrams.
690 _aBUILDING AND CONSTRUCTION-PROJECTS
942 _n0
948 _c04/03/1997
999 _c14988
_d14988