| 000 | 00876cab a2200217 4500 | ||
|---|---|---|---|
| 001 | ABS40232 | ||
| 008 | 090401t1989 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u22380 | ||
| 041 | _aeng | ||
| 110 |
_aAnthony Williams and Partners _93 |
||
| 245 | _aPerronet Thompson School | ||
| 260 | _c1989 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding _v254(7582) 27 January 1989, 45-52(8) |
||
| 520 | _aA "Building Dossier" on construction of a comprehensive school on the outskirts of Kingston upon Hull , Humberside , which is an unusual design with a central "spine" running the length of the building, spanned by a glazed barrel vault. Includes a cost commentary and elemental cost analysis. Many photographs. | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 650 | _aSCHOOL BUILDINGS | ||
| 690 | _aBUILDING AND CONSTRUCTION-PROJECTS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c14994 _d14994 |
||