| 000 | 01225cab a2200301 4500 | ||
|---|---|---|---|
| 001 | ABS53180 | ||
| 008 | 090401t1995 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u2545 | ||
| 041 | _aeng | ||
| 100 | _aBordass, B. | ||
| 245 | _aAvoiding office air-conditioning | ||
| 260 | _c1995 | ||
| 350 | _a0 | ||
| 490 |
_aArchitects` Journal _v202(3) 20 July 1995, 37-39(3) |
||
| 520 | _aDiscovers ways of reducing energy costs in office buildings particularly through alternatives to air conditioning systems. Highlights common architectural and engineering problems, which contribute to unnecessary cost and looks at mixed mode designs, which enable air conditioning to be partially used or easily put in place by later occupiers. References. | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING ELEMENTS-COMPLETE BUILDING SERVICES ELEMENTS-COMPLETE HEATING, VENTILATION AND AIR CONDITIONING SYSTEMS | ||
| 650 | _aALTERNATIVES | ||
| 650 | _aENERGY CONSERVATION | ||
| 650 | _aENERGY USE | ||
| 650 | _aMIXED MODE | ||
| 650 | _aNATURAL VENTILATION | ||
| 650 | _aOFFICE BUILDINGS | ||
| 650 | _aOFFICE DESIGN | ||
| 650 | _aVENTILATION | ||
| 690 | _aBUILT ENVIRONMENT-CONSTRUCTION DESIGN | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c1531 _d1531 |
||