000 01132cab a2200265 4500
001 ABS40331
008 090401t1989 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u23117
041 _aeng
100 _aLamden, B.
245 2 _aA curate`s egg
260 _c1989
350 _a0
490 _aChartered Quantity Surveyor
_v11(6) February 1989, 30-31(2)
520 _aDescribes American construction and cost management techniques. While agreeing that actual construction time is fast in relation to the UK, the author explains factors which control the speed such as lower standards of detailed finishes and fitting-out, finishing at the shell and core stage, differences in design and the stiffer penalties in the US for subtrades who do not perform. Explains the role of the construction manager and reviews lessons for the UK.
650 _aBUILDING INDUSTRY
650 _aFAST TRACK
650 _aMANAGEMENT CONTRACTING
650 _aUNITED STATES
650 _aVALUE ENGINEERING
690 _aBUILDING AND CONSTRUCTION-OVERSEAS
690 _aQuantity surveying