000 01074cab a2200241 4500
001 ABS40339
008 090401t1989 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u23169
041 _aeng
100 _aEvamy, M.
245 _aUnderneath the arches with Laing
260 _c1989
350 _a0
490 _aContract Journal
_v347(5704) 9 February 1989, 20-21(2)
520 _aReports on the progress of the air rights scheme at Charing Cross station in London . Embankment Place is being developed jointly by the Greycoat Group and British Rail Property Board. When complete the office building will be suspended from nine steel arches mounted on heavy columns passing straight through the station platforms and into the vault below; in the unlikely event of the station being demolished, the building above should be left unaffected.
650 _aBUILT ENVIRONMENT-CONSTRUCTION DESIGN
650 _aOFFICES
650 _aOVERSAILING
650 _aRAILWAY STATIONS
690 _aBUILDING AND CONSTRUCTION-PROJECTS
942 _n0
948 _c04/03/1997
999 _c15511
_d15511