| 000 | 01074cab a2200241 4500 | ||
|---|---|---|---|
| 001 | ABS40339 | ||
| 008 | 090401t1989 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u23169 | ||
| 041 | _aeng | ||
| 100 | _aEvamy, M. | ||
| 245 | _aUnderneath the arches with Laing | ||
| 260 | _c1989 | ||
| 350 | _a0 | ||
| 490 |
_aContract Journal _v347(5704) 9 February 1989, 20-21(2) |
||
| 520 | _aReports on the progress of the air rights scheme at Charing Cross station in London . Embankment Place is being developed jointly by the Greycoat Group and British Rail Property Board. When complete the office building will be suspended from nine steel arches mounted on heavy columns passing straight through the station platforms and into the vault below; in the unlikely event of the station being demolished, the building above should be left unaffected. | ||
| 650 | _aBUILT ENVIRONMENT-CONSTRUCTION DESIGN | ||
| 650 | _aOFFICES | ||
| 650 | _aOVERSAILING | ||
| 650 | _aRAILWAY STATIONS | ||
| 690 | _aBUILDING AND CONSTRUCTION-PROJECTS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c15511 _d15511 |
||