| 520 | _aInvestigates the building method devised by Domain International to cut construction time. Steel box units are assembled on site and infilled with concrete to provide the unit with a loadbearing property so that frames are not required to support the modules. The method has been used for building hotel blocks and would be ideal for single-person units. Diagrams, plan. | ||