| 245 | _aTilt-up system puts new town on fast track approach | ||
| 260 | _c1986 | ||
| 350 | _a0 | ||
| 490 |
_aSurveyor _v167 (4992) 27 November 1986,16-17 (2) |
||
| 520 | _aDescribes how the American fast track method of tilt-up construction is being used to construct factories at Glenrothes , Scotland in only four weeks. Tilt-up is a construction method of some 28 years standing whereby reinforced concrete wall panels are cast horizontally on-site,and tilted into position. The system results in considerable savings in time and cost and provides buildings offering durability,security,impact resistance and minimal maintenance. | ||
| 650 | _aINDUSTRIAL BUILDINGS | ||
| 650 | _aPREFABRICATED CONCRETE PANEL CONSTRUCTION | ||