| 000 | 00709cab a2200217 4500 | ||
|---|---|---|---|
| 001 | WB3014-05 | ||
| 008 | 090401t1994 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u23875 | ||
| 041 | _aeng | ||
| 245 | _aHalve cost of building | ||
| 260 | _c1994 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding _v259(7839) 15 April 1994, 8(1) |
||
| 520 | _aContractors and consultants should strive to halve construction costs within 10 years in a national campaign to provide clients with a better service according to the director general of CIRIA. | ||
| 650 | _aCONSTRUCTION COSTS | ||
| 650 | _aFORECASTS | ||
| 650 | _aPRODUCTIVITY | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c15985 _d15985 |
||