000 00932cab a2200277 4500
001 WB3041-04
008 090401t1994 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u25105
041 _aeng
245 _aNew Austrian method
260 _c1994
350 _a0
490 _aFinancial Times
_v4 November 1994, 8(2)
520 _aDiscusses the risks involved in the New Austrian Tunnelling Method and highlights projects that have used the system internationally. Indicates that London Underground may stop using the method for the Jubilee Line extension because of safety considerations.
650 _aFRANKFURT
650 _aINFRASTRUCTURE PROJECTS
650 _aJUBILEE LINE EXTENSION
650 _aNEW AUSTRIAN TUNNELLING METHOD
650 _aPAKISTAN
650 _aSOUTH AFRICA
650 _aTUNNELING METHODS
650 _aWASHINGTON
690 _aBUILT ENVIRONMENT
942 _n0
948 _c04/03/1997
999 _c16837
_d16837