| 000 | 00889cab a2200229 4500 | ||
|---|---|---|---|
| 001 | ABS51419 | ||
| 008 | 090401t1994 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u25742 | ||
| 041 | _aeng | ||
| 100 | _aOrnsby, S. | ||
| 245 | _aAdequacy of the mineral planning system in the aftermath of MPG6 | ||
| 260 | _c1994 | ||
| 350 | _a0 | ||
| 490 |
_aMineral Planning _vSeptember 1994, 9-11(3) |
||
| 520 | _aSummary of the author`s address to the 1994 Annual Sand and Gravel Association conference reviewing the state of the mineral planning system after MPG6 looking at the role of the development plan, the case for productivity capacity and the role of industry witnesses at public inquiries. | ||
| 650 | _aDEVELOPMENT PLANS | ||
| 650 | _aMINERAL PLANNING | ||
| 650 | _aMINERALS PLANNING GUIDANCE NOTE SIX | ||
| 690 | _aMINING AND MINERALS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c17301 _d17301 |
||