000 00713cab a2200229 4500
001 ABS40826
008 090401t1989 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u26194
041 _aeng
100 _aCrompton, D.
245 _aParliamentary test for Cardiff Bay barrage
260 _c1989
350 _a0
490 _aConstruction News
_v(6111) 11 May 1989, 46-47(2)
520 _aBriefly outlines the strategy for the regeneration of Cardiff Bay , assessing the practical problems to be faced in construction of the proposed barrage scheme.
650 _aDOCKLANDS
650 _aURBAN RENEWAL
650 _aWALES
690 _aPLANNING LAW AND PRACTICE
942 _n0
948 _c04/03/1997
999 _c17586
_d17586