000 00834cab a2200217 4500
001 WB3303-05
008 090401t1997 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u26337
041 _aeng
245 _aChannel tunnel rail link
260 _c1997
350 _a0
490 _aFinancial Times
_v16 January 1997, 10(2)
520 _aLondon & Continental Railways (LCR) the winners of the contract to build the high speed Channel Tunnel link, is to finalise the construction details in the next 6 months in an attempt to reassure investors that the project will be managed to time and cost. Map; timetable.
650 _aCHANNEL TUNNEL RAIL LINK
650 _aLONDON & CONTINENTAL RAILWAYS
690 _aBUILDING AND CONSTRUCTION-PROJECTS
690 _aTRANSPORT AND COMMUNICATIONS
942 _n0
948 _c04/03/1997
999 _c17687
_d17687