| 000 | 00606cab a2200229 4500 | ||
|---|---|---|---|
| 001 | WB2838-78 | ||
| 008 | 090401t1992 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u26614 | ||
| 041 | _aeng | ||
| 245 | _aFast track to 21st century | ||
| 260 | _c1992 | ||
| 350 | _a0 | ||
| 490 |
_aTimes _v28 September 1992, LT3(1) |
||
| 520 | _aExamines the revitalisation of railway architecture. | ||
| 650 | _aDESIGN | ||
| 650 | _aRAILWAY STATIONS | ||
| 650 | _aRAILWAYS | ||
| 690 | _aBUILT ENVIRONMENT-CONSTRUCTION DESIGN | ||
| 690 | _aTRANSPORT AND COMMUNICATIONS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c17900 _d17900 |
||