| 000 | 00899cab a2200289 4500 | ||
|---|---|---|---|
| 001 | WB3025-07 | ||
| 008 | 090401t1994 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u26902 | ||
| 041 | _aeng | ||
| 245 | _aEC liability directive may be dropped | ||
| 260 | _c1994 | ||
| 350 | _a0 | ||
| 490 |
_aContract Journal _v374(5980) 23 June 1994, 6(1) |
||
| 520 | _aThe General Services Liability Directive, which would impose a 20-year defect liability period on construction, is expected to be dropped. | ||
| 650 | _aBUILDING DEFECTS | ||
| 650 | _aCONSTRUCTION INDUSTRY | ||
| 650 | _aCONTRACTORS | ||
| 650 | _aDEFECT LIABILITY PERIOD | ||
| 650 | _aDEFECTS | ||
| 650 | _aEC DIRECTIVES | ||
| 650 | _aGENERAL SERVICES LIABILITY DIRECTIVE | ||
| 650 | _aLIABILITY | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING PATHOLOGY | ||
| 690 | _aEUROPE-SINGLE MARKET | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c18122 _d18122 |
||