| 000 | 00753cab a2200193 4500 | ||
|---|---|---|---|
| 001 | WB2626-04 | ||
| 008 | 090401t1990 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u3051 | ||
| 041 | _aeng | ||
| 245 | _aConcrete blight | ||
| 260 | _c1990 | ||
| 350 | _a0 | ||
| 490 |
_aNew Builder _vno 40 28/6/90 p4,5&7 |
||
| 490 |
_aNew Civil Engineer _vno903 5/7/90 p11&12(3) |
||
| 520 | _aLooks at the concrete blight problems centred in Cornwall known as mundic and the attempts by several organizations including the RICS and IStructE to undertake research into the problem. Wimbleball Dam in Devon is confirmed to be the first major modern concrete structure to be afflicted by mundic. | ||
| 690 | _aBUILT ENVIRONMENT | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c1843 _d1843 |
||