| 000 | 00693cab a2200217 4500 | ||
|---|---|---|---|
| 001 | ABS41072 | ||
| 008 | 090401t1989 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u28024 | ||
| 041 | _aeng | ||
| 100 | _aPowell-Smith, V. | ||
| 245 | 3 | _aAn entitlement to remain on site? | |
| 260 | _c1989 | ||
| 350 | _a0 | ||
| 490 |
_aContract Journal _v350(5728) 27 July 1989, 7(1) |
||
| 520 | _aWith reference to case law, this article examines whether a contractor is entitled to remain on site when a contract is determined or forfeited. | ||
| 650 | _aBUILDING CONTRACT | ||
| 650 | _aDETERMINATION | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c18900 _d18900 |
||