000 00693cab a2200217 4500
001 ABS41072
008 090401t1989 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u28024
041 _aeng
100 _aPowell-Smith, V.
245 3 _aAn entitlement to remain on site?
260 _c1989
350 _a0
490 _aContract Journal
_v350(5728) 27 July 1989, 7(1)
520 _aWith reference to case law, this article examines whether a contractor is entitled to remain on site when a contract is determined or forfeited.
650 _aBUILDING CONTRACT
650 _aDETERMINATION
690 _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS
942 _n0
948 _c04/03/1997
999 _c18900
_d18900