| 000 | 00572cab a2200181 4500 | ||
|---|---|---|---|
| 001 | WB2614-48 | ||
| 008 | 090401t1990 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u29489 | ||
| 041 | _aeng | ||
| 245 | _aRoads to the Channel tunnel | ||
| 260 | _c1990 | ||
| 350 | _a0 | ||
| 490 |
_aTimes _v4/4/90 p2 |
||
| 520 | _aA report from the RTPI emphasises the need for strategic planning of roads to the Channel tunnel to allow the benefits of the Channel link to reach all parts of the UK. | ||
| 690 | _aTRANSPORT AND COMMUNICATIONS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c19857 _d19857 |
||