245 _aBuilder`s duty to warn
260 _c1989
350 _a0
490 _aBuilding Today
_v198(5825) 28 September 1989, 41(1)
520 _aExamines the decision in University of Glasgow v W Whitfield ; and John Laing Construction (1988) (Transcript), in which a claim arose out of a serious design defect. The University sued the architect , who transferred part of the blame to the contractor , stating that the contractor had failed in his duty to warn either the client of the architect of the problem.
650 _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS
650 _aBUILDING DEFECTS
650 _aECONOMIC LOSS
650 _aLIABILITY