| 000 | 00666cab a2200193 4500 | ||
|---|---|---|---|
| 001 | ABS41352 | ||
| 008 | 090401t1989 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u29677 | ||
| 041 | _aeng | ||
| 110 |
_aDavis Langdon and Everest _91155 |
||
| 245 | _aCost forecast: reduced workload | ||
| 260 | _c1989 | ||
| 350 | _a0 | ||
| 490 |
_aArchitects` Journal _v190(13) 27 September 1989, 83-87(5) |
||
| 520 | _aComprehensive overview of current trends in the building industry together with a forecast of building costs and tender prices over the next two years. Tables, graphs. | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c19964 _d19964 |
||