| 000 | 00814cab a2200229 4500 | ||
|---|---|---|---|
| 001 | ABS41373 | ||
| 008 | 090401t1989 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u29773 | ||
| 041 | _aeng | ||
| 100 | _aBubel, K | ||
| 245 | _aTrouble filling regulation gaps | ||
| 260 | _c1989 | ||
| 350 | _a0 | ||
| 490 |
_aArchitects` Journal _v190(11) 13 September 1989, 17(1) |
||
| 520 | _aArgues the need for an improvement to the Building Regulations and design guidelines for architects involved in the re-design of out-dated football stadia , and reports on problems encountered in constructing the new purpose-built stadium for St Johnstone FC. | ||
| 650 | _aBRADFORD | ||
| 650 | _aFIRE | ||
| 650 | _aSPORTS STADIUM | ||
| 690 | _aBUILDING AND CONSTRUCTION-REGULATIONS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c20022 _d20022 |
||