| 000 | 00665cab a2200205 4500 | ||
|---|---|---|---|
| 001 | ABS41386 | ||
| 008 | 090401t1989 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u29839 | ||
| 041 | _aeng | ||
| 100 | _aStewart, A. | ||
| 245 | _aUplifting story | ||
| 260 | _c1989 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding _v254(7615) 15 September 1989, 86-87(2) |
||
| 520 | _aLooks at the latest development in lift technology designed to speed-up fast track construction. A prototype has been installed in Bovis `s Old Bailey project in the City of London . | ||
| 650 |
_aBlock management _96220 |
||
| 690 |
_aBlock management _96220 |
||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c20073 _d20073 |
||