| 000 | 00741cab a2200205 4500 | ||
|---|---|---|---|
| 001 | ##ABS51495 | ||
| 008 | 090401t1994 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u30316 | ||
| 041 | 0 | _aeng | |
| 110 | 2 |
_aDavis Langdon and Everest _91155 |
|
| 245 | 0 | 0 |
_aCost model _bCity of London office blocks |
| 260 | _c1994 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding _v259(7864) 14 October 1994, 42-48(7) |
||
| 520 | _aTakes a typical office in the City of London and tabulates costs for each stage of the building process: funding; design; procurement; and construction. A detailed cost build-up is given and a project timetable. | ||
| 651 | 4 | _aCITY OF LONDON | |
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c20427 _d20427 |
||