000 00741cab a2200205 4500
001 ##ABS51495
008 090401t1994 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u30316
041 0 _aeng
110 2 _aDavis Langdon and Everest
_91155
245 0 0 _aCost model
_bCity of London office blocks
260 _c1994
350 _a0
490 _aBuilding
_v259(7864) 14 October 1994, 42-48(7)
520 _aTakes a typical office in the City of London and tabulates costs for each stage of the building process: funding; design; procurement; and construction. A detailed cost build-up is given and a project timetable.
651 4 _aCITY OF LONDON
690 _aBUILT ENVIRONMENT-BUILDING COSTS
942 _n0
948 _c04/03/1997
999 _c20427
_d20427