| 000 | 00773cab a2200217 4500 | ||
|---|---|---|---|
| 001 | ABS37266 | ||
| 008 | 090401t1987 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u3356 | ||
| 041 | _aeng | ||
| 245 | _aKeeping the site dry | ||
| 260 | _c1987 | ||
| 350 | _a0 | ||
| 490 |
_aContract Journal _v22 January 1987, 19-22 (4) |
||
| 520 | _aA feature on how to prevent warterlogged building sites . 1) Stemming the flow. R. Swann reports on preventative measures which can be taken before the bad weather sets in. 19 (1). 2) Pumping iron. P.Anderson examines the use of pumps and choice of equipment. 20-22 (3). | ||
| 650 | _aDEWATERING | ||
| 650 | _aGROUNDWATER CONTROL | ||
| 650 | _aWATER REMOVAL | ||
| 690 | _aBUILT ENVIRONMENT | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c2058 _d2058 |
||