| 000 | 00581cab a2200193 4500 | ||
|---|---|---|---|
| 001 | ABS41526 | ||
| 008 | 090401t1989 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u30746 | ||
| 041 | _aeng | ||
| 100 | _aSpring, M. | ||
| 245 | _aBridging a cross | ||
| 260 | _c1989 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding _v254(7620) 20 October 1989, 73-78(5) |
||
| 520 | _aDescribes the construction of Embankment Place the office block being built on a steel arch bridge over Charing Cross Station . | ||
| 690 | _aBUILDING AND CONSTRUCTION-PROJECTS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c20723 _d20723 |
||