| 000 | 00869cab a2200241 4500 | ||
|---|---|---|---|
| 001 | ABS37270 | ||
| 008 | 090401t1987 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u3391 | ||
| 041 | _aeng | ||
| 100 | _aPowell-Smith, V. | ||
| 245 | _aClaims protection - a faulty clause | ||
| 260 | _c1987 | ||
| 350 | _a0 | ||
| 490 |
_aContract Journal _v1/8 January 1987, 13 (1) |
||
| 520 | _aExamines a loophole in a clause by which a subcontractor might hope to protect himself from claims by the main contractor. | ||
| 520 | _aThis article is no longer held by the RICS Library but can be obtained via inter-library loan. Please ask Library staff for details. | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||
| 650 | _aEXCLUSION CLAUSE | ||
| 650 | _aNEGLIGENCE | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c2079 _d2079 |
||