| 000 | 00810cab a2200217 4500 | ||
|---|---|---|---|
| 001 | ABS41672 | ||
| 008 | 090401t1989 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u31592 | ||
| 041 | _aeng | ||
| 100 | _aRidout, G. | ||
| 245 | _aDon`t shake Rattle`s role | ||
| 260 | _c1989 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding _v254(7624) 17 November 1989, 71-76(6) |
||
| 520 | _aAn illustrated feature on the construction of Birmingham `s International Convention Centre . The main problem facing the joint venture contractor was how to ensure that noise and vibration from trains which run in a tunnel under the site will not affect the building and its occupants. | ||
| 650 | _aCONVENTION CENTRES | ||
| 650 | _aRAILWAYS | ||
| 690 | _aBUILDING AND CONSTRUCTION-PROJECTS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c21208 _d21208 |
||