| 000 | 00822cab a2200229 4500 | ||
|---|---|---|---|
| 001 | ABS41939 | ||
| 008 | 090401t1989 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u33600 | ||
| 041 | _aeng | ||
| 100 | _aErwin, G.J. | ||
| 245 | 4 | _aThe synthesis of network models and expert systems | |
| 260 | _c1989 | ||
| 350 | _a0 | ||
| 490 |
_aCost Engineering _v31(11) November 1989, 13-19(7) |
||
| 520 | _aCriticises current building design evaluation techniques and identifies problems inherent in traditional cost modelling techniques. Puts forward ideas for a new basis synthesising network modelling and expert systems . | ||
| 650 | _aBUILT ENVIRONMENT-CONSTRUCTION DESIGN | ||
| 650 | _aCOMPUTERS | ||
| 690 | _aBUILT ENVIRONMENT-CONSTRUCTION DESIGN | ||
| 700 | _aBowen, P. A. | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c22420 _d22420 |
||