| 000 | 00586cab a2200193 4500 | ||
|---|---|---|---|
| 001 | ABS42278 | ||
| 008 | 090401t1990 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u35921 | ||
| 041 | _aeng | ||
| 100 | _aPowell-Smith, V. | ||
| 245 | _aMain contractors` responsibility | ||
| 260 | _c1990 | ||
| 350 | _a0 | ||
| 490 |
_aContract Journal _v354(5762) 22 March 1990, 9(1) |
||
| 520 | _aExplains how GC/Works/1 Edition 3 deals with the subcontractor .(See also Abs 42090, 42091 and 42092) | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c23474 _d23474 |
||