000 00634cab a2200205 4500
001 ABS42467
008 090401t1990 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u37035
041 _aeng
100 _aPowell-Smith, V.
245 _aCompletion date risks
260 _c1990
350 _a0
490 _aContract Journal
_v354(5764) 5 April 1990, 8(1)
520 _aWarns of the pitfalls, which can come with a fixed completion date and the inadequacy of JCT 1980 extension of time provisions.
650 _aJCT 1980 CL23.1.1
690 _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS
942 _n0
948 _c04/03/1997
999 _c23968
_d23968