| 000 | 00578cab a2200193 4500 | ||
|---|---|---|---|
| 001 | ABS37382 | ||
| 008 | 090401t1987 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u4027 | ||
| 041 | _aeng | ||
| 245 | _aGothic renewal | ||
| 260 | _c1987 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding Trades Journal _v193(5692) 12 February 1987, 28(1) |
||
| 520 | _aBriefly describes the refurbishment of the Midland Hotel in Manchester , one of the first steel framed buildings in the United Kingdom. | ||
| 650 | _aHOTELS | ||
| 690 |
_aRefurbishment _96264 |
||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c2414 _d2414 |
||