000 00628cab a2200193 4500
001 ABS42612
008 090401t1990 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u37852
041 _aeng
100 _aReina, P.
245 _aTunnel of turmoil
260 _c1990
350 _a0
490 _aSurveyor
_v173(5088) 29 March 1990, 10-13(4)
520 _aDiscusses Kent CC `s objections to the Channel Tunnel rail link covering the route, noise levels, alternative routes and describes Kent`s series of key criteria for the links design.
690 _aTRANSPORT AND COMMUNICATIONS
942 _n0
948 _c04/03/1997
999 _c24352
_d24352