000 00697cab a2200217 4500
001 ABS42822
008 090401t1990 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u38969
041 _aeng
100 _aPhipps, M.
245 _aBeware the dubious value of oral instructions
260 _c1990
350 _a0
490 _aBuilding
_v255(7653) 22 June 1990, 38(1)
520 _aExamines the problems which may arise if an oral instruction in a contract is not followed up by written confirmation.
650 _aJCT STANDARD FORM OF BUILDING CONTRACT (1980 EDITION)
650 _aJCT 1987
690 _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS
942 _n0
948 _c04/03/1997
999 _c24983
_d24983