| 000 | 00808cab a2200229 4500 | ||
|---|---|---|---|
| 001 | WB2343-11 | ||
| 008 | 090401t1987 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u39013 | ||
| 041 | _aeng | ||
| 245 | _aHospital repair ruling challenged | ||
| 260 | _c1987 | ||
| 350 | _a0 | ||
| 490 |
_aNew Civil Engineer _vno 763, 29/10/87 p6-7 |
||
| 520 | _aStructural engineers R T James and Partners is to appeal against a High Court ruling that it is liable for 7m of remedial work carried out on the new cardiac wing of Great Ormond Street Hospital for Sick Children, following the discovery of design defects. (See WB2342-11) | ||
| 650 | _aBUILDING DEFECTS | ||
| 650 | _aHOSPITALS | ||
| 650 | _aLIABILITY | ||
| 650 | _aNEGLIGENCE | ||
| 690 | _aBUILT ENVIRONMENT | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c25010 _d25010 |
||