| 000 | 00666cab a2200205 4500 | ||
|---|---|---|---|
| 001 | ##ABS51676 | ||
| 008 | 090401t1994 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u39046 | ||
| 041 | 0 | _aeng | |
| 110 | 2 |
_aDavis Langdon and Everest _91155 |
|
| 245 | 0 | 0 |
_aCost model _bhotels |
| 260 | _c1994 | ||
| 350 | _a0 | ||
| 490 | 0 |
_aBuilding _v259(7870) 25 November 1994, 52-59(8) |
|
| 520 | _aGives a costing of a typical budget hotel, including model design criteria, funding breakdown, method statement and programme and a detailed cost build up. | ||
| 651 | 4 |
_aUnited Kingdom _y |
|
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c25037 _d25037 |
||