| 000 | 00721cab a2200181 4500 | ||
|---|---|---|---|
| 001 | WB2327-06 | ||
| 008 | 090401t1987 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u39202 | ||
| 041 | _aeng | ||
| 245 | _aManagement contracting | ||
| 260 | _c1987 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding Trades Journal _v vol 194 no 5713 9/7/87 p4 |
||
| 520 | _aA guidance note from the Health and Safety Commission , Managing health and safety in construction Part II, due to be published later this year, concentrates on management contracting which can pose grave health and safety risks through poor planning, lack of co-ordination and lax control on site. | ||
| 690 | _aBUILT ENVIRONMENT | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c25155 _d25155 |
||