| 000 | 00806cab a2200241 4500 | ||
|---|---|---|---|
| 001 | WB2929-49 | ||
| 008 | 090401t1993 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u39339 | ||
| 041 | _aeng | ||
| 245 | _aKing`s Cross rethink | ||
| 260 | _c1993 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding Design _v(1134-1135) 23 July 1993, 1(1) |
||
| 520 | _aBritish Rail has appointed Sir Norman Foster to assess regeneration potential of the King`s Cross Goods Yard site in the event of St Pancras being chosen for the Channel Tunnel terminal instead of Kings Cross. | ||
| 650 | _aCHANNEL TUNNEL RAIL TERMINAL | ||
| 650 | _aKINGS CROSS GOODS YARD SITE | ||
| 650 | _aKINGS CROSS | ||
| 650 | _aPLANNING BLIGHT | ||
| 650 | _aURGAN REGENERATION | ||
| 690 | _aURBAN RENEWAL | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c25254 _d25254 |
||