000 00634cab a2200205 4500
001 WB2808-33
008 090401t1992 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u39467
041 _aeng
245 _aEast Thames plan is too big
260 _c1992
350 _a0
490 _aBuilding
_v257 (7733) 21 February 1992, 11(1)
520 _aConsultants LLewelyn-Davies Planning has advised the SoS for the Environment to scale down plans for developing the East Thames Corridor.
650 _aCHANNEL TUNNEL
650 _aEAST THAMES CORRIDOR
690 _aPLANNING LAW AND PRACTICE
942 _n0
948 _c04/03/1997
999 _c25337
_d25337