000 00661cab a2200205 4500
001 ABS43159
008 090401t1990 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u40605
041 _aeng
245 _aConcise building cost analysis
260 _c1990
350 _a0
490 _aSurveyor (Institution of Surveyors` Malaysia)
_v 25(2) 2nd Quarter 1990, 19-27(9)
520 _aCost analysis for an office building and for a research building; plus cost of materials and labour in Malaysia .
650 _aBUILT ENVIRONMENT-BUILDING COSTS
650 _aOVERSEAS
690 _aBUILT ENVIRONMENT-BUILDING COSTS
942 _n0
948 _c04/03/1997
999 _c26017
_d26017