| 000 | 00661cab a2200205 4500 | ||
|---|---|---|---|
| 001 | ABS43159 | ||
| 008 | 090401t1990 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u40605 | ||
| 041 | _aeng | ||
| 245 | _aConcise building cost analysis | ||
| 260 | _c1990 | ||
| 350 | _a0 | ||
| 490 |
_aSurveyor (Institution of Surveyors` Malaysia) _v 25(2) 2nd Quarter 1990, 19-27(9) |
||
| 520 | _aCost analysis for an office building and for a research building; plus cost of materials and labour in Malaysia . | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 650 | _aOVERSEAS | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c26017 _d26017 |
||