000 00676cab a2200229 4500
001 ABS43253
008 090401t1990 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u41082
041 _aeng
100 _aKay, R.
245 _aLessons from the Towyn flooding
260 _c1990
350 _a0
490 _aPlanner
_v76(32) 17 August 1990, 10-12(3)
520 _aTaking the breach of coastal defences at Towyn as an example, the author reinforces the need to consider flood risk in the planning process.
650 _aSTRUCTURE PLANS
650 _aWALES
690 _aPLANNING LAW AND PRACTICE
700 _aWilkinson, A.
942 _n0
948 _c04/03/1997
999 _c26372
_d26372