| 000 | 00810cab a2200217 4500 | ||
|---|---|---|---|
| 001 | WB2504-29 | ||
| 008 | 090401t1989 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u42177 | ||
| 041 | _aeng | ||
| 245 | _aHigh tech growth in Cambridge | ||
| 260 | _c1989 | ||
| 350 | _a0 | ||
| 490 |
_aPlanning (for the Natural and Built Environment) _vno 802, 20/1/89 p7 |
||
| 520 | _aA draft development strategy for industrial growth in the Cambridge region has been produced by consultants at Cambridge University. Prime targets for the controlled dispersal of such growth have been identified as Ely, St Neots, Ramsey, Chatteris, March and Haverhill. | ||
| 650 | _aHIGH TECH | ||
| 650 | _aHOUSING | ||
| 650 | _aINDUSTRIAL PROPERTY | ||
| 690 | _aPLANNING LAW AND PRACTICE | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c27095 _d27095 |
||