000 00596cab a2200193 4500
001 WB2440-01
008 090401t1988 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u42601
041 _aeng
245 _aEurotunnel costs rise
260 _c1988
350 _a0
490 _aFinancial Times
_v4/10/88 p27
520 _aAccording to the Anglo-French Euro-Tunnel consortium, the Channel Tunnel , due to be opened next May, will cost 7.2% more than originally predicted.
650 _aBUILT ENVIRONMENT-BUILDING COSTS
690 _aBUILT ENVIRONMENT
942 _n0
948 _c04/03/1997
999 _c27265
_d27265