| 000 | 00851cab a2200205 4500 | ||
|---|---|---|---|
| 001 | ABS43903 | ||
| 008 | 090401t1991 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u44204 | ||
| 041 | _aeng | ||
| 245 | _aContract placing: ensuring where the buck doesn`t stop | ||
| 260 | _c1991 | ||
| 350 | _a0 | ||
| 490 |
_aProperty Confidential _v(25) January 1991, 8-11(4) |
||
| 520 | _aIn the light of current concern over who is liable when the design and/or construction of a building fails, this article examines how the correct choice of building contract can reduce the potential for loss and also considers, if problems of liability do arise, two possible solutions: latent defect insurance and collateral warranties . | ||
| 650 | _aBUILDING DEFECTS | ||
| 650 | _aDEVELOPMENT | ||
| 690 | _aBUILT ENVIRONMENT | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c28178 _d28178 |
||