| 000 | 00789cab a2200217 4500 | ||
|---|---|---|---|
| 001 | ABS44469 | ||
| 008 | 090401t1991 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u47308 | ||
| 041 | _aeng | ||
| 100 | _aLindon, D. | ||
| 245 | _aCosting the future of construction | ||
| 260 | _c1991 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding Services & Environmental Engineer _v13(8) April 1991, 19 |
||
| 520 | _aStresses the importance of involving the quantity surveyor early in the design stage to prevent time-wasting revision of plans as clients adjust their price range and to enable better use of a quantity surveyor`s skills. | ||
| 650 | _aENGINEERING SERVICES | ||
| 650 | _aMECHANICAL AND ELECTRICAL SERVICES | ||
| 690 |
_aQuantity surveying _96263 |
||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c29836 _d29836 |
||