000 00789cab a2200217 4500
001 ABS44469
008 090401t1991 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u47308
041 _aeng
100 _aLindon, D.
245 _aCosting the future of construction
260 _c1991
350 _a0
490 _aBuilding Services & Environmental Engineer
_v13(8) April 1991, 19
520 _aStresses the importance of involving the quantity surveyor early in the design stage to prevent time-wasting revision of plans as clients adjust their price range and to enable better use of a quantity surveyor`s skills.
650 _aENGINEERING SERVICES
650 _aMECHANICAL AND ELECTRICAL SERVICES
690 _aQuantity surveying
_96263
942 _n0
948 _c04/03/1997
999 _c29836
_d29836